Installation workflow
Every rooftop installation in Guna follows the same sequence: a site survey, custom engineering, net-metering documentation, and panel commissioning. Here is how each stage works.
Four stages
01
We assess your roof, shading, structure, and electrical connection to confirm the system size that suits the building.
02
Our team designs the layout for your roof and prepares the system drawings needed for review and installation.
03
We help prepare subsidy paperwork and DISCOM net-metering applications, and follow them through the approval steps.
04
Once installation and approvals are complete, we commission the system and confirm it is connected to the grid.
Compliance status
MNRE approval is currently pending document verification. We will confirm its status once the documents have been checked.— Brother Solar Energy