Four stages

How a project moves forward

01

Site survey

We assess your roof, shading, structure, and electrical connection to confirm the system size that suits the building.

02

Custom engineering

Our team designs the layout for your roof and prepares the system drawings needed for review and installation.

03

Net-metering documentation

We help prepare subsidy paperwork and DISCOM net-metering applications, and follow them through the approval steps.

04

Panel commissioning

Once installation and approvals are complete, we commission the system and confirm it is connected to the grid.

Compliance status

MNRE approval is currently pending document verification. We will confirm its status once the documents have been checked.— Brother Solar Energy